Description

Capacity for 6 PAX, has stretchers kit.
Fresh paint and cabin refit in 2024.
Will be delivered with the overhauled Engine 2.
IFR equipped, hangar kept.

Major maintenance tasks that were recently performed:
● First engine turbine exchange
● Tail Rotor straps replacement
● Main rotor hub inspection
● Tail rotor gearbox overhaul
● Tail bolts replacement (boom to fuselage)
● Linear actuator replacement

 


ENGINES

Engine 1, TSN: 3113
Engine 2, TSN: 5837

Yuri-Dzun

  • 1 Active listing.

You must be logged in to send a message.

Related listings